Oilfield Well Frac Sand Flow
HomeHome > Products > API 16C Pressure Frac > Oilfield Well Frac Sand Flow
Oilfield Well Frac Sand Flow

Oilfield Well Frac Sand Flow

Overview Product Description The choke and manifold is necessary device for successful control on well kick and implemen
Overview
Basic Info.
Model NO. Choke & Kill Manifold
Application1 Energy & Mining/Petroleum Machinery Parts
Machine Type Choke & Kill Manifold
Transport Package Wooden Box
Specification AS customer required
Trademark JX PETRO
Origin Dongying
HS Code 84314310
Production Capacity 2000PCS/Month
Product Description
Product Description

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

The choke and manifold is necessary device for successful control on well kick and implementation of oil and gas well pressure control technologies. It is designed, manufactured and inspected in accordance with API Spec.16C.
Choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components. It is adopted to execute new drilling-well's technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve's opening, so balanced drilling can work under minimum pressure-difference.Kill manifold consists of check valves, gate valves, line pipes, pressure gauges. In case of increase in well head pressure, the kill manifold can provide a means of pumping heavy drilling fluid into the well to balance bottom hole pressure so that well kick and blowout can be prevented. In this case, by using blow down lines connected to the kill manifold, the increasing well head pressure also can be released directly for bottom hole pressure release. or water and extinguishing agent can be injected into the well by means of kill manifold.Features:

  1. Reduced weight and footprint to allow for standard freight options
  2. Meet API Spec 6A,API Spec 16C,NACE MR-0175
  3. Offers manual and/or hydraulic actuator options
  4. Universal function LCP tested and delivered with manifold
  5. Can fit with fixed base or lifting base
  6. Hydraulically actuated components allow for remote operation

Specifications:
Item NameChoke Manifold
ModelJG-35JG-35 JG-70JG-105
Main path and Side path in(mm)3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78)
Working Pressure psi (mpa) 3000(21)5000(35)3000(21)10000(70)
Working Temperature ºC (°F)P.U -29~121 (-20~250)
Working medium Mud Gas(sulfur-hydrogen)
Material gradeDD-FF
Item NameKill Manifold
ModelYG-35YG-70YG-105
Main path and Side path in(mm)3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78)
Working Pressure psi(mpa) 5000(35)10000(70)15000(105)
Working Temperature°C(°F)P.U -29~121 (-20~250)
Working medium Mud Gas(sulfur-hydrogen)
Material gradeDD-FF

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Hot Sales Products

Company Profile

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Packaging & Shipping

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

FAQ

Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.