Bop Control Hose/API 16D/Refractory/Stainless Steel Armor/Blowout Preventer
Product Description 1. Technical features:The reinforced layer steel wire adopts the high-strength steel wire for windin
Basic Info.
Model NO. | LFM |
Surface Treatment | Spray-Paint |
Operation Pressure | Manual |
Material | Stainless Steel |
Standard | API 16D |
Transport Package | Wooden Package |
Specification | 3000psi to 10000psi |
Trademark | LFM |
Origin | China |
Production Capacity | 1000 |
Product Description
Product Description1. Technical features:The reinforced layer steel wire adopts the high-strength steel wire for winding hose imported from Japan;the inner rubber adopts the special formula of our company's petroleum hose, which can withstand water, gas and hydraulic oil, and the inner wall is also abrasion-resistant.It can withstand the test of high temperature and severe cold weather, and adopts different formulas according to different media; the end joint adopts suitable 45K/60K material according to the pressure and use environment and undergoes anti-corrosion treatment and heat treatment.The joint crimping adopts our patented technology. The diameter of the pipe body and the joint are consistent, and there is no obstruction, no eddy current and shear damage; the refractory layer adopts our company's invention patent, and the fire resistance performance should meet the rated working pressure greater than 5min under the condition of 705ºC flame temperature. It adopts anti-static armored full-diameter structure, polyurethane outer covering structure and rubber-plastic alloy outer covering structure, which is resistant to corrosion and wear.2. Purpose:It is suitable for the connection between the blowout preventer and the control system in oil drilling, and can also be used for conveying power and transmission medium in other high temperature and flammable places.3. Executive standard: API Spec 16D SY/T 7387-2017.
CertificatesFAQ
Q1: What's your packing?
A: Regular packing.Q2: What's your delivery?
A: Normally, about 30-45 days.Q3: What are the shipping methods?
A: Ocean shipment to the port near from you; Air shipment to the shipment near from your company; Door to door service by international express.Q4: What about the payment options? A: In general, we accept T/T. Q5: When can I get the price?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price,please call us or tell us in your email so that we will detail with your inquiry priority.
previous:
API Certified Product Fz28
Send to us